Capacity & Energy

Translate scheduled devices and operating hours into GPU-hours and an explicit facility-energy estimate.

Your assumptions

Illustrative defaults. Currency inputs use US dollars.

Accounting share of allocated time, not hardware utilisation.
Average operating draw; not the nameplate TDP.
YOUR SCENARIO

Keep the boundary visible.

Ready to calculate

JavaScript is required for local calculations.

No information is sent.

Formula and units

GPU-h = devices × days × scheduled hours/day. Productive-equivalent GPU-h = GPU-h × productive share. Facility kWh = GPU-h × (average GPU kW + host kW/GPU) × PUE. Energy-only cost = facility kWh × US$/kWh.

How to read the result

The model treats the entered average draw as applying during all scheduled hours. Productive share does not reduce that assumed draw. Off-schedule idle energy, embodied impacts, storage/network power beyond the host allocation and peak design are excluded. The result is an allocation, not a metered bill or performance forecast.

Show the method

GPU-h = devices × days × scheduled hours/day. Productive-equivalent GPU-h = GPU-h × productive share. Facility kWh = GPU-h × (average GPU kW + host kW/GPU) × PUE. Energy-only cost = facility kWh × US$/kWh.

Recalculate after changing inputs. The download records inputs and results together. There is no live data connection and no automatic persistence. Reloading may discard your inputs.